Capsule House S3 - Parameters

DIMENSION

5600*2150*2500mm

AREA

12m²

RECOMMENDED CAPACITY

1-2 PERSONS

FLOOR PLAN DESIGN

Interior space floor plan:Plan flexibly based on labeled positions of walls, doors, and windows, or achieve further customization by modifying base configurations.

APPLICABLE SCENARIOS

  • Tourist Camp
  • Scenic Area Accommondation
  • Specialty Homestay Project
  • Backyard Independent Dwellings
  • Independent Studio

Product details

This configuration sheet is for product features and usage reference only and does not constitute construction drawings or final technical documentation.

The final configuration shall be subject to the contract and technical confirmation documents. (Movable furniture is not included in this quotation.)

Main Structure and Exterior System
  • Main frame — Hot-dip galvanized steel, thickness 2-3mm
  • Outer shell — Aluminum alloy panel, thickness 2mm
  • Surface treatment — Exterior paint
  • Thermal insulation and waterproofing layer — Polyurethane foam insulation layer 80-100mm
  • Glass curtain wall — 6+16A+6 european grey insulated
  • Skylight — 6+16A+6 european gry insulated
  • Front door — Customized door
  • Entrance lock — Hotel outdoor waterproof smart foor lock
  • Electrical compartment — Air conditioner and water heater
  • Equipment compartment — Customized aluminum alloy door
  • Perimeter and overhead light strip — Ambient surround LED light strip
Interior System
  • Ceiling — High-grade eco-friendly fiberboard finishing
  • Wall — Advanced eco-carbon crystal board
  • Floor — Premium eco-friendly WPC decking
  • Cabin — Ambient surround LED light strip
  • High-end customized panel design
  • Branded downlight lighting
  • Motorized Curtain track
Bathroom System
  • Bathroom privacy door — One-way frosted tempered glass
  • Ceiling and wall — Eco-carbon crystal board+premium aluminum alloy finishing
  • Branded shower set
  • Bathroom vanity/basin/mirror/cabinet/floor drain
  • Premium smart toilet Bathroom ceramic floor tiles3-in-1 bathroom unit with light, ventilation and heating
  • Towel rail
Electrical System
  • Whole-house branded cables — 1.5/2.5/4/10 square meter & cat 6 network cable
  • Branded insulated PVC conduit
  • Burst-resistant and pressure-rated piping for whole house water systems
  • Branded water heater
  • Branded 2HP + 1.5HP inverter cooling & heating air conditioning system
  • US standard duplex receptacle /
  • Grounded receptacle
  • Switch plate / USB outlet plate
Intelligent Control System
  • Power on with card insertion / power off upon card removal
  • Multi-scene mode control panel
  • Intelligent lighting control
  • Intelligent curtain control
  • Intelligent voice system
Accessory
  • Lifiting eye
  • Transportation tie-down
  • Structural connector
Optional System
  • Three-Step Entrance Staircase
    Curtain
  • Branded electric underfloor heating system
  • Electrically heat-traced water & drain system with insulation and protection
  • HD projector
  • Kitchen(Including range hood, induction cooker, kitchen cabinet, refrigerator)
  • Sofa
  • Bed+mattress

SHENGCHENG C4

Hot-dip galvanized steel structure

Our space capsule mobile home is equipped with a hot-dip galvanized steel main frame. It delivers superior anti-corrosion and anti-rust performance, perfectly adapting to coastal salt spray and high-humidity environments. The frame features an ultra-long service cycle and nearly maintenance-free operation, with a 50-year warranty for the steel frame.

The integrated structure is robust and stable, featuring great wind and seismic resistance as well as anti-deformation performance. The entire capsule can be hoisted and relocated as a whole unit. All steel components are welded in accordance with standardized structural layouts to maximize shock absorption. Thanks to this professional structural design, our capsule houses can be safely installed in all earthquake-prone areas with no hidden safety risks.

Full Smart Home Standard Configuration

Every capsule mobile home comes with a complete smart system as standard: multi-scene control panel, smart voice control, hotel-style intelligent access control, whole-house lighting system, motorized curtains system, cooling and heating air conditioner and electric water heater.


If the standard setup cannot satisfy your project demands, customized adjustments to the capsule house are accessible.

Easy Installation with Pre-set Water & Power Interfaces

All water, electric and sewage connection are pre-installed on the capsule house for quick on-site hookup.


Before installation, you may contact your local construction team in advance to complete site preparation work, including ground bearing foundation, household power supply, water supply pipeline and sewage drainage pipeline.

FAQs

Please read our FAQs page to find out more.

Production and Delivery Cycle

Production generally takes 7-45 days, and delivery takes about 40-60 days depending on the shipping route.

Service & After-sales Policy Statement

Installation Support: We provide detailed installation drawings and remote video guidance. If needed, we can recommend third-party installation teams (at extra cost).
Warranty: The main structure is covered by a 5-year warranty. Electrical appliances and accessories are covered by a 1-year warranty (excluding man-made damage and force majeure).Spare Parts Support: We provide spare parts delivery service after sales. Some parts can be shipped directly to the client.
Customer Support: Our bilingual (Chinese-English) support team is available via Shopify, WhatsApp, Email, WeChat, and other platforms.
Customization: Personalized design and material upgrades are available. Clients can also handle interior customization locally.

Purchase and transportation instructions

1. Select the product model and quantity, confirm the product price, delivery location, and sign the contract for payment. Our company will produce after receiving the advance payment.
2. When the production of the goods is completed, you arrange a video call or go to the factory for acceptance. After the acceptance is completed, you pay the balance.
3. After our company receives the final payment, you can arrange for a freight forwarder to pick up the goods or we can handle transportation, booking and shipping for you.
4. After the freight forwarding company completes the booking, our company will pack and secure the products. After confirming the shipping space, the goods will leave the factory and be shipped by sea.5. Preparation before receiving the goods:
5.1 After you place the order, my engineering department will provide you with basic construction reference drawings. You need to ask your local engineering team in advance to help you prepare the basic load-bearing capacity of the space capsule and the water source for the home. Household power supply and sewage pipes. The above conditions should be met before the goods arrive at the site.5.2 Confirm transportation plan from port to site.
6. The goods arrive at the port: When the goods arrive at the port, you need to ask your freight forwarding company to help you with customs clearance and transport the goods back to your project site;

Installation instructions

1. Install the product according to the instructions provided by SHENGCHENG.
2. When the goods arrive at the site, you need to arrange in advance for the crane to unload the truck to your designated location. 

3. Arrange 2-3 workers in advance to wait on site to prepare for unloading and installation. 

4. Professional hydropower engineers are required on site. 

5. SHENGCHENG can remotely guide the installation through real-time video.

Warranty

We provide a 1-year warranty. After you place an order, we will provide you with basic drawings of water and electricity. During product production and transportation, we will provide you with installation guidance videos, and will also set up a working group and dedicated personnel to handle your installation process and work.
However, we really cannot provide more services for glass and home appliances;
1. Our glass is made of the same material as automobile glass, so we may need to consider the glass. If you purchase a large amount, we will consider sending you spare parts. Of course, if the glass really needs to be replaced, we can send you drawings and material requirements. If you can find a replacement locally, then you can replace it locally;
2. The other is the home appliance products and configurations. When we use them in China, they will provide us with 1-3 years of after-sales service. However, there is a high probability that we will not be able to do this when exporting products, so some of our overseas customers will directly replace home appliances with local services, such as air conditioners, water heaters, etc.

Didn’t find your answer?

Don't hestitate to contact us